Methodology

The standard it is measured against

To judge whether a number is right, you need to know which framework it is measured against. None of these is a convention of our own.

See the sources
Defense 1 · Reference framework

F1, F2 and F3 factors, with their definition declared

Reconciliation factors are widely used across the industry, but their definitions vary between companies. Argus Mine declares its own — and they are not an analogy: they are database columns.

FactorCalculationWhat it measuresTypical owner
F1
Mine vs. plan
mined / plannedOperational compliance: was the design mined, where it was designed?Operations · Mine
F2
Plant vs. mine
plant / minedInventory control: did what left the mine reach the plant? Losses in stockpiles, haulage or misdirection.Mine Control · Logistics
F3
Plant vs. plan
plant / plannedBlock model reliability: does the resource estimate predict what actually reaches the plant?Geology · Resources
Core principle: every measurement point — mine, stockpile, crusher, plant — must be a real and independent measurement, never a recomputation of the same geometry along two paths. It is the same requirement for independent data at each stage that the reconciliation literature sets out.

When comparing with the literature: in the classic formulation (Parker, 2012), F1 compares the grade-control model with the reserve model. Argus Mine's F1 measures spatial compliance with the design — what the literature calls mine-to-plan compliance (Otto and Musingwini, 2019) — and leaves block model reliability to F3. See the sources

Defense 2 · Volumetric method

3D partial block: the method that gets audited

Mining packages offer two conventions for intersecting a block model with a surface. Argus Mine uses the one that goes into an auditable reserves report.

Whole block (centroid)

The block is either fully in or fully out, depending on where its center falls. Fast, and valid for long-term planning where sub-block resolution means nothing.

3D partial block · Argus Mine

The fraction of the block's volume that falls inside is calculated, prorated in plan and in elevation. It is what is used when the number goes into an auditable report.

Why it matters: measured, not assumed

In a phase with a small footprint (about 3,000 m²) against 25×25×5 m blocks, the centroid test returned exactly the same 150 blocks in the first and last period, even though the design grew 15% in area: 11 of 12 periods reported 0 t. With partial blocks, the same phase detects 20,449 t of actual progress.

Our own measurement on a demonstration dataset, not on client data.

Defense 3 · Engine auditability

Reconciling the reconciliation

The principle of independent measurements also applies to the software that computes the reconciliation: the costliest defects are not found by reading code, but by recomputing the answer outside the engine.

1

Independent volumetrics

Recompute the period's cumulative total directly against the design geometry, bypassing the engine's cache. Catches order-of-magnitude divergences: double counting or a delta that swallowed the whole phase.

2

Volume from surfaces

Pure prismatic method over the TIN mesh, without touching the block model. The mean elevation per period proves whether the pit is actually getting deeper.

3

Telescoping identity

Results are stored as deltas per period: the sum of deltas up to period N must equal the actual cumulative total at N. If it doesn't close, something is double counted.

4

Measurability, before selling

Count how many blocks the design contributes in the first and last period of a phase. If the number doesn't change, progress falls below the model's resolution and the factors would read 1.000 for lack of measurement, not compliance.

All four checks run in SQL against the database, without touching the application. A Competent Person can run them on their own.

Defense 4 · Data honesty

Never fabricate the missing assumption

A system that invents a number to avoid leaving a field empty gets caught only once — and never recovers. These are product rules, not implementation accidents.

No economic assumption, no NPV

If the discount rate or valuation date is missing, the NPV fields stay empty and flagged. Never zero.

Empty is not zero in measured grade

An element that was not assayed stays blank. An explicit 0.0 would be treated as a real measurement and wipe out the block's grade.

“Not verified” is not “verified and correct”

If there are no QAQC samples, or the real or nominal price basis is not declared, the result is flagged as not verifiable.

“Unknown” and “multiple” are valid causes

Assigning a cause the data doesn't support sends the wrong person to investigate and burns credibility faster than an imprecise number.

Directional severity

A favorable deviation calls no one: 0 mÂł of overbreak is the best possible result, not a critical alert.

The economic sign is never forced

Impact is derived from each block's actual net NSR. An unmined block of ore with negative NSR avoids a loss.

When the measurement itself is in doubt, who gets called changes: if grade control QAQC fails, the laboratory is called first, not the resource geologist.
Defense 5 · Attribution

Argus Mine decides nothing. It produces evidence someone has to sign.

The argument every mine settles by hierarchy — is it an operations problem or a geological model problem? — becomes a number that can be arbitrated. Attribution is not cosmetic: it is the product.

WhoWhat they sign or decideWhich signal calls them
Resource geologistThe block model and its estimationDegraded F3
Competent Person / QPThe resources and reserves statementSustained F3 by zone
Mine planningThe design and schedule of each phaseF1, schedule variance
SurveyThe as-built survey and its moistureCause: survey control
Grade controlBlast-hole samplingCause: sample preparation
LaboratoryAssayed grade and its quality controlCause: laboratory assay
Drill and blastOverbreak and underbreakOverbreak / underbreak
Mine operationsMining what was designed, where it was designedF1, misdirection
Metallurgist / plantIndependent feed measurementF2 not interpretable
Geotechnical engineerSlope stability and deformationInSAR / ICESat-2
Management controlDiscount rate and real or nominal basisNPV, price basis
Management and boardWhat gets prioritized and what is acceptedMateriality, value at risk
Defense 6 · Position

We don't replace your software. We connect it.

Argus Mine acts as a horizontal integrator across the value chain: it consumes what your operation already produces and reconciles the result.

Learning is private to each site

The learned normal range and the history the system remembers are never mixed across sites or across clients.

History recall

Every reconciliation is indexed: the system finds periods with the same deviation pattern even if they happened long ago, and answers whether the previous mitigation worked.

Multi-site, multi-projection

Each site runs in its own UTM zone and satellite layers in WGS84, in a single corporate dashboard.

Every standard and study cited on this page has its full reference in Sources.